Cost Function for Plant Buildings Maintenance

Cost Functions

The original cost function (A1) is as follows:

Función de costo para mantenimiento de edificaciones (1)This function has as a variable (x) that represents the pumping capacity in gpm (gallons per minute) which will be the same as the plant. The unit conversion is carried out and it is obtained:

Función de costo para mantenimiento de edificaciones (2)

Additional modifications to this function correspond to the correction of costs per year, with the CCI ENR index of 9547 of the year 2013, to obtain A3. Then part B2 related to the elasticity index is added. This is done in the same way as explained in the Cost Functions Wiki — General.

According to the above, the following is the functiFunción de costo para mantenimiento de edificaciones (3)on obtained: